E. FACILITIES
Sanitary ware
High quality European origin sanitary fittings.
Shower with mixer.
Washbasin with mixer.
Toilet.
Paper holder.
Soap case.
Bathroom walls will be covered with porcelain or ceramic tiles.
Sewerage
Drainage pipes will be made from plastic.
Plumbing
Complete plumbing installation.
For the apartments on the top floor, a pressure system and a hot water return system will be installed.
Gutters
Comprising of plastic pipes.
Water supply
The owners/buyers will comply with the terms of the Water Supply Council regarding the supply and the process of installing water meters.
Warm Water
Will be provided by electric water heaters with a capacity of 150 lt.
For the apartments on the top floor, Solar Water Heaters will be installed in the areas indicated in the drawings.
Electrical works and Telephone wiring
Wiring will be placed into the walls and ceiling tiles.
The electrical installations of each apartment will be designed to provide ample lighting and complete furniture placement.
In each apartment there will be a complete installation of a telephone network through external lines. Inside each apartment there will be 1 telephone point and 1 TV point.
For each bedroom there will be 3 sockets, in the living room 4 sockets, in the kitchen a socket for each appliance and 2 free sockets.
There will be intercoms in all apartments with a general panel at the entrance of the apartment building which will feature an electric lock.
Owners/buyers will abide by the EAC terms regarding the installation and supply process.
Provisions
Installation of an alarm system.
Camera system installation.
Installation of a video door entry system.
Installation of a surround system (4 points in the living room).
Offer amounts for additional benefits
CCTV system.
Additional sockets.
CAT 6 network.
Air conditioning
Provisions for A/C split units throughout the apartment
1 x provision for each bedroom (1/4., 3/8 with armored cable 7x1.5mm)
1 x provision in the living room / kitchen (1/4., 1/2 with armored cable 7x2.5mm)
The compressors will be placed on the terraces.
For the top floors the compressors will be mounted on the roof.
Central Heating
Provision will be made for the installation of underfloor heating based on the mechanical drawings.
Includes the mechanical work inside the apartment, the lightweight concrete and the special mixture that will cover the underfloor heating.
Possibility of installing a heat pump.
Elevator
The building will be equipped with a lift.
Capacity 5 people.